Quality

Quality & process

Outsource is controllable; release stays in-house. Process text follows engineer source—no invented ISO certificate numbers.

Certificate scans / sample inspection sheets: TBD

Process loop

Die cast → Machine → Polish → Surface outsource → Return QC → Pack

Die cast→
Machine→
Polish→
Surface outsource→
Return QC→
Pack

QC nodes (from case wording)

Bodies: impregnation + pressure hold

High-pressure die casting for airtightness; vendors machine only; release in-house. Zero customer complaints after delivery (engineer source).

Assemblies: multi-stage full inspection

Incoming → in-process → pre- and post-plating dual full inspection → outbound, one closed loop.

Working rules (tooling)

  • Mold confirmed before tooling kickoff: drawings and mold sign-off first, then tooling and volume path.
  • Mutual benefit, shared success: long-term work follows executable plans.